AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
It is further extended Dum Dum to Noapara, a length of 2.091 Kms, on 10th July 2013. In October 2010, Metro services further extended upto Kavi Subhash, a length of 2.851 Kms. In Phase-I, a length of 16.45 Kms from Dum Dum to Tollygunge (Mahanayak Uttam Kumar) completed in 1995 and in Phase-II a length of 5.834 Kms from Mahanayak Uttam Kumar to Kavi Nazrul Metro station is completed in August, 2009. The Metro Railway, Kolkata was constructed progressively from 1972 to 2021. The first metro line in India was completed on 24th October 1984, a stretch of about 3.4 km between Esplanade and Bhowanipur (Netaji Bhavan), thrown open for the Public. Based on traffic studies, the Dum Dum – Tollygunge corridor was first selected for implementation and work started on 29th December, 1972. It extends from Dakshineswar to Kavi Subhash Metro station near Garia, on the busy North-South axis of Kolkata over a length of 31.365 Kms. Metro Railway, Kolkata is the first underground Metro in India. Gati-Shakti Cargo Terminal (GCT) Application Minister of State in the Ministry of Railways Public Information Regarding Train Accident.Achievements of Minstry of Railways & Ministry of Commerce and Industry.SYSTEM MAP AND MISCELLANEOUS INFORMATION.Empanelled Hospitals & Diagnostic Centres.
0 Comments
Read More
Leave a Reply. |